Your current browser version is too low, in order to bring you a better browsing effect, please use a higher version browser

home > Reference > Pure Water Electrolysis Equipment
Pure Water Electrolysis Equipment

Project Name: Pakistan China Power Hub 2×660MW Coal-fired Power Generation Project
Project location: Northwest of Karachi, Pakistan
Storage capacity: The planned capacity of the power plant is 2×660MW ultra-supercritical coal-fired air-cooled units.
Running time: 2018

More

Project Name: Pakistan China Power Hub 2×660MW Coal-fired Power Generation Project

Project location: Northwest of Karachi, Pakistan

Storage capacity: The planned capacity of the power plant is 2×660MW ultra-supercritical coal-fired air-cooled units.

Running time: 2018

 

  • Hydrogen generation: 10Nm3/h
  • Hydrogen purity (volume ratio%): ≥ 99.999%
  • Hydrogen humidity: dew point temperature ≤ -60℃
  • Hydrogen outlet pressure: ≥3.0MPa, Max(3.5MPa.)
  • The outlet pressure of the hydrogen storage tank: ≥3.0MPa.

Send Your Message